Moray East Wind Farm
GeoSea (DEME Group Belgium), in a joint venture with Smulders Belgium, has built 55 jackets for the Moray East Offshore Windfarm. The jackets and substations are installed into a total of 309 pin piles, which are driven into the sea bed.

Those pin piles were coated with ZINGA for an active mudline protection after fabrication by EEW (Germany) and Bifab (Scotland). More than 40,000 m² have been protected with ZINGA. This windfarm has a capacity of 950 MW and covers an area of 295 km². It will supply 950,000 households with electricity.
Downloads
File Name Action
mgd-moray-east-wind-farm.pdf Download