Sunnysands Railway Bridge & Beach Gates

The Service:
This was a total refurbishment project, and the entire structure was blast-cleaned and film-galvanised with Zinga.

As the bridge is on the coast, the system used was: Zinga: 80μm DFT + Alufer N: 160μm DFT + 2K PU: 60μm DFT

Zinga (galvanising layer) + Alufer N (one component MIO PU sealer) + 2K polyurethane (UV resistant finishing coat)

← Older Post Newer Post →